|
If the weather stays stabile, the construction of two sections of the A4 in Malopolska can commence29 March 2010A spokeswoman for the Krakow branch of the GDDKiA Magdalena Chacaga announced on Thursday (21 January 2010) that the Directorate-General has assigned contractors for the construction sites, sections: Szarów-Brzesko (23 kilometers long) and Wierzchosławice-Cross near Tarnow (length of 13 kilometers). |

|